Heather Sea (research vessel)
ECS Navi - Sailor 4000 system hardware repair and SVDR commissioning
-
MV Stena Scandinavica (Sweden)
- Dismantle of WC-Units
- Dismantle of wall and ceiling panels
- Total number of demolished cabins- 220
-
SV Af Chapman (Sweden)
- Complete refurbishment of wooden deck (800m2)
- Isolation materials installation
- Wall and ceiling panels installation
- Painting
- Cabin furniture installation
- Tile laying and sanitary blocks installation
- Class B15 and A20 doors installation
- Old furniture and accessories renovation
- Galley montage and epoxy filling of floor
-
Passenger rivership Gogol (Russia)
- Sanitary system reconstruction
- HVAC system reconstruction
- Dining area outfitting
-
Escort tug Eridan (BLRT, Estonia)
- Isolation installation
- Ventilation installation
- Wall and ceiling panels installation
- Floor covering
- Fabrication and installation of furniture
- Sanitary equipment installation
- Galley and laundry equipment installation
-
Catamarans
- Isolation installation
- Wall and ceiling panels installation
- Floating floor and deck covering installation
- Fabrication and installation of console in the wheelhouse
- Fabrication and installation of furniture
-
Deep Cygnus (Norway)
- Isolation installation
- Ventilation system construction
- Wall and ceiling panels installation
- Interior outfitting of cabins
- Stainless steel installation
- Tiles laying in bathrooms
- Class B15 and A20 doors installation
-
MV Butterfly (Riga Latvia)
- Wall and ceiling panels manuf. and installation
- Control panel design, manuf. and installation
- Formica laying on the floor and filling of stitches with Sikaflex
-
Ferry Alandia (Eckero Line)
- Full Dismantling of living area
- New steel bulkheads installation
- Isolation installation
- Ventilation system reconstruction
- Wall and ceiling panels installation
- Deck covering
- Sliding fire doors installation
- Commercial equipment installation
- Stairways carpeting replacement
-
MV Klaudia Elanskaja
- Insulation installation
- Installation of ventilation pipes
- Installation of wooden wall and ceiling panels
- Furniture installation
- Installation of tiles and sanitary
- Porthole installation
-
M/S Superstar (Tallink)
- Defective wall panels replacement in the cafeteria and bar
- Perfume and distillery shop furniture alternation
- Shop deck covering replacement
- Cartpeting replacement in coridors
- Furniture alternation in coridors
- Antislip mounts replacement on the corners of gangways
- Carpeting replacemt near information desk
- Tiles reinstallation in laundry room and change of foundation for washing machines
- Sliding doors A60 coasting replacement
-
Norwegian Epic (STX Europe)
- Module cabin installation (1050 units on 5 decks)
- Public area outfitting
-
Barge Aj96 Akva Group (Estonia)
- Turn Key project basis
- Insulation installation
- Outfitting
- Furniture supply
- Galley equipment supply
- Laundry equipment supply
-
Barge 52834, 52837, 52838 Akva Group (Estonia)
- Turn Key project basis
- Insulation installation
- Outfitting
- Furniture supply
- Galley equipment supply
- Laundry equipment supply
-
Floating Research Station (Tallinn, Estonia)
- Insulation installation
- Self-levelling mixture application on the floor
- Wall and ceiling panels installation
- Suspended ceiling installation
- Furniture installation
- Tiles laying